Dependent on source, some Volkswagen Approved Used Cars may have had multiple users as part of a fleet and/or be ex-business use. In order to meet the strict Approved Used programme requirements, all cars are subject to no less than a comprehensive multipoint check by our trained Volkswagen Technicians to ensure that they meet the same exacting standards regardless of source. Volkswagen requires Volkswagen Retailers to ensure that information on previous vehicle ownership is correct based on the V5 logbook detail. The logbook may include the detail of the last owner only (and not any or all earlier owners), and will not detail how the owner used the vehicle. Neither Volkswagen or Volkswagen retailers can guarantee that vehicles have not been used for business or other purposes. For further information (including logbook details), please consult your Volkswagen Retailer.
Lithium-ion batteries, of the type used in most electric vehicles (including Volkswagen electric vehicles) have a restricted lifespan. Battery capacity will reduce over time, with use and charging. Reduction in battery capacity will affect the performance of the vehicle, including the range achievable, and is one of a number of factors that may impact resale value. New vehicle performance figures (including battery capacity and range) may be provided for the purposes of comparison between vehicles. You should not rely on new vehicle performance figures (including battery capacity and range), in relation to used vehicles with older batteries, as they will not reflect used vehicle performance in the real world. For further information on battery degradation/preservation and the Volkswagen 8 year/100,00 mile new car battery warranty, please see here.[Volkswagen New, Used & Extended Warranties | Volkswagen UK]. Exclusions and Warranty Terms Apply
Volkswagen Golf 8 GTI 2.0 TSI 245PS 7-speed DSG 5 Door Golf 8 GTI 2.0 TSI 245PS 7-speed DSG 5 Door
Finished in Pure White with Pure White Jacara Cloth interior
Yeomans Volkswagen Helston
PANORAMIC SUNROOF AND HEATED SEATS!!
Solutions personal contract plan representative example: Duration 48 Months, 47 Monthly payments of £424.86, Optional final payment £15,627.50, Vehicle price £31,795, Customer deposit £6,359.00, Volkswagen deposit contribution £250.00, Amount of credit £25,186.00, Total charge for credit £10,419.92, Total amount payable £42,214.92, Representative APR 13.3% APR, Rate of interest (fixed) 13.3%, Expected / annual mileage 10,000 miles, Excess mileage 9.00p per mile.
Personalise your finance







































Yeomans Volkswagen Helston
- Fuel typePetrol
- TransmissionAutomatic
- Mileage5,445 miles â—Šâ—Š
- Registration date01.03.2024
- RegistrationWL24ABN
- Doors-
- Previous owners2
- CO2 (WLTP)- ‡CO2‡ Fuel consumption and CO2 figures for Volkswagen Approved Used Cars may be derived from WLTP technical procedures or the previous NEDC regime, depending on the age of the vehicle. Figures shown are for comparability purposes; only compare fuel consumption, CO2 and equivalent electric range figures with other vehicles tested to the same technical procedures (i.e. only compare figures labelled WLTP with other vehicles tested through WLTP and only compare figures labelled NEDC with other vehicles tested through NEDC). These figures may not reflect real life driving results, which will depend upon a number of factors including the accessories fitted (post-registration), variations in weather, driving styles, speed, vehicle age, vehicle load (and for battery electric vehicles, the starting charge of the battery and the battery age). Zero emissions while driving. Figures quoted are subject to change due to ongoing approvals/changes. Please consult your retailer for further information. Data correct at March 2024.
- MPG (WLTP)- ‡Fuel Consumption‡ Fuel consumption and CO2 figures for Volkswagen Approved Used Cars may be derived from WLTP technical procedures or the previous NEDC regime, depending on the age of the vehicle. Figures shown are for comparability purposes; only compare fuel consumption, CO2 and equivalent electric range figures with other vehicles tested to the same technical procedures (i.e. only compare figures labelled WLTP with other vehicles tested through WLTP and only compare figures labelled NEDC with other vehicles tested through NEDC). These figures may not reflect real life driving results, which will depend upon a number of factors including the accessories fitted (post-registration), variations in weather, driving styles, speed, vehicle age, vehicle load (and for battery electric vehicles, the starting charge of the battery and the battery age). Zero emissions while driving. Figures quoted are subject to change due to ongoing approvals/changes. Please consult your retailer for further information. Data correct at March 2024.
Specification
- Power245 bhp / 248 PS
- Fuel typePetrol
- Engine size2,000 cc
- CO2 (WLTP)- ‡
- MPG (WLTP)- ‡
Personalise your finance
Volkswagen Golf 8 GTI 2.0 TSI 245PS 7-speed DSG 5 Door Golf 8 GTI 2.0 TSI 245PS 7-speed DSG 5 Door
Finished in Pure White with Pure White Jacara Cloth interior
Select a finance product
Approved Used Plus Benefits

When you buy from a participating Volkswagen Retailer, and you purchase with a Solutions Personal Contract Plan you will receive:
13.4% APR Representative1
1Order by 31/08/2025.Indemnities may be required. Excludes Used vehicles aged 0-12 months and Volkswagen Commercial Vehicles. Volkswagen Finance.2Covers two consecutive services for Petrol, Diesel and eHybrid vehicles. Servicing for Battery Electric Vehicles also includes 1 x MOT. Volkswagen Finance.3For vehicles up to 100,000 miles at point of activation. Accurate at 05/25.4Subject to eligiblity. Volkswagen Car Insurance is provided and underwritten by U K Insurance Limited.530 day/1,000 mile exchange policy as long as the vehicle is returned in the same condition as when collected. T&Cs apply. *Up to 12 months cover included with an Approved Used purchase as standard.
Retailer details
Every effort has been made to ensure the accuracy of the information above. However, errors may occur. Check with your local Retailer about items which may affect your decision to purchase.
◊Prices shown are set and determined by the local Volkswagen Retailer named in the listing and are, therefore, variable based on your postcode search. The prices may include any Retailer offers, discounts or other allowances.
◊◊Every effort has been made to ensure the accuracy of the mileage advertised as part of the Approved Used programme. A full check will be completed by the selling retailer. Vehicle history and mileage verification are not applied to vehicles which are Isle of Man or Channel Island registered. Volkswagen UK Stock vehicles can be sourced through your local Retailer. Price may vary by Retailer.
‡ Fuel consumption and CO2 figures for Volkswagen Approved Used Cars may be derived from WLTP technical procedures or the previous NEDC regime, depending on the age of the vehicle. Figures shown are for comparability purposes; only compare fuel consumption, CO2 and equivalent electric range figures with other vehicles tested to the same technical procedures (i.e. only compare figures labelled WLTP with other vehicles tested through WLTP and only compare figures labelled NEDC with other vehicles tested through NEDC). These figures may not reflect real life driving results, which will depend upon a number of factors including the accessories fitted (post-registration), variations in weather, driving styles, speed, vehicle age, vehicle load (and for battery electric vehicles, the starting charge of the battery and the battery age). Zero emissions while driving. Figures quoted are subject to change due to ongoing approvals/changes. Please consult your retailer for further information. Data correct at March 2024.